04_projects:01_clock
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
04_projects:01_clock [2024/07/30 16:56] – [Preparing the Gear Shafts] jattie | 04_projects:01_clock [2024/08/01 15:15] (current) – [Installing gear shafts] jattie | ||
---|---|---|---|
Line 230: | Line 230: | ||
==== Installing gear shafts ==== | ==== Installing gear shafts ==== | ||
- | Proceed | + | Once the shafts are cut to length and cleaned up, proceed |
{{ : | {{ : | ||
+ | {{ : | ||
+ | {{ : | ||
===== Assembly Rods ===== | ===== Assembly Rods ===== | ||
Line 240: | Line 242: | ||
{{ : | {{ : | ||
- | {{ : | ||
- | {{ : | ||
===== References ===== | ===== References ===== |
04_projects/01_clock.1722358577.txt.gz · Last modified: 2024/07/30 16:56 by jattie