04_projects:01_clock
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
04_projects:01_clock [2024/07/30 16:41] – [Pendulum Clock Design] jattie | 04_projects:01_clock [2024/08/01 15:15] (current) – [Installing gear shafts] jattie | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ~~CLOSETOC~~ | + | ~~TOC~~ |
|<100% 25% - >| | |<100% 25% - >| | ||
^ \\ 3D PRINTING AND DESIGN REFERENCE DOCUMENT\\ \\ ^^ | ^ \\ 3D PRINTING AND DESIGN REFERENCE DOCUMENT\\ \\ ^^ | ||
Line 20: | Line 20: | ||
This document is not completed yet, it is a work in progress with updates added as the build process progresses. | This document is not completed yet, it is a work in progress with updates added as the build process progresses. | ||
+ | |||
+ | The first part of the document discusses the design process and the second part [[04_projects: | ||
+ | |||
+ | |||
===== Background ===== | ===== Background ===== | ||
Line 192: | Line 196: | ||
===== Preparing the Gear Shafts ===== | ===== Preparing the Gear Shafts ===== | ||
+ | |||
+ | The gear shafts are cut from any 4mm round rod material. I had some 4mm steel wire and searched for 4mm bearings to go with that. | ||
{{ : | {{ : | ||
Line 224: | Line 230: | ||
==== Installing gear shafts ==== | ==== Installing gear shafts ==== | ||
- | Proceed | + | Once the shafts are cut to length and cleaned up, proceed |
{{ : | {{ : | ||
+ | {{ : | ||
+ | {{ : | ||
===== Assembly Rods ===== | ===== Assembly Rods ===== | ||
Line 234: | Line 242: | ||
{{ : | {{ : | ||
- | {{ : | ||
- | {{ : | ||
===== References ===== | ===== References ===== |